Fabrication work October and November 2022

October was spent taking a few trips and relaxing. When I was working on the car, I did not take any pictures. I didn't realize this until November, when I went on a sudden picture burst.

The chassis has been coming along at a quick pace and I re-installed the seats, front wheels and steering yesterday to re-check fitment and ergonomics.

I just received the new gas pedal, which I will be installing today. On order for this weekend is the wiring harness which will be routed through the frame next week. I need to re-install the body to fabricate the door stops and frame, as well as the same for the hood/trunk(s). Also on order are some door strikers and latches which will be used for all openings.

I plan to install the new engine maybe during holiday break, or early next year. I still need to secure the rear sub-assembly with actual bolts (also TBD when body is back on for wheel fitment confirmation.
























Comments

Popular posts from this blog

Pausing the Blog

The "getting screwed from friends and work" plan