The first part of the month of March was spent honing the final design, and then mulling it over for a bit to make sure I didn't have any more changes. I then created shop drawings for cutting and welding, as well as a materials list, to order any supplement steel pieces. Once those arrived, I organized them and started working on marking the steel for cutting.
Instead of a typical chop saw, I utilized a "steel demon" blade in my miter saw and circular saw, in order to cut the pieces. It was a bit tricky, but the angles were precise, and the work was well worth it. I used a circular sander bought from Harbor Freight to square up the edges to minimize any gaps. It took me a week to cut all the tube for the 2x4 tube part of the frame (the "backbone"), and a couple of days to weld the components together. I need to clean the shop up so that I can weld the backbone of the frame together in final assembly.
In April I will be working on that and cutting the pieces for the 1.5x3 tube part of the frame, which will include the center tunnel frame and the rear firewall frame.
Comments
Post a Comment